Power

29 Sep, 2015
A PC suffices to get the students to interact with a plant or system simulator with accurate physical data. Statement by an instructor from CORYS, Camille Bonnard.
22 Jul, 2015
Several severe accident models were installed by CORYS on US nuclear plant full scope simulators these last few years. The training course described below was a first-of-a-kind. It appeared to be a creative and very effective training exercise, ...
17 Jul, 2015
Simulation has resulted in a whole new way of carrying out de-bugging during I&C design. Bugs can be detected more cheaply, and spotted much earlier on; their root causes can be determined, and suggested solutions assessed. This revolution ...
12 Dec, 2014
CORYS is extending its range of PC-based training resources to enrich classroom training and accelerate simulator-based training. The resources feature all the key topics: basic principles, the detailed workings of systems, and abnormal and ...
10 Dec, 2014
Connexion cluster is a French research programme with funding of €36 million. Its goal is to develop power plant Instrumentation & Control that is easier to maintain in the long term and cheaper to develop and operate. CORYS is one of the ...
24 Oct, 2014
The delivery of a flooding model as part of the training simulator for the Monticello nuclear power plant in Minnesota is a technical first. The aim is to prepare operators for this natural hazard – one that is being monitored very closely by the ...
12 Sep, 2014
Bohunice marks CORYS’ second simulator renovation for a VVER 440 power plant. This large-scale project included new neutronic and thermal-hydraulic models.
29 Mar, 2014
Commissioned in 1985 by GSE Systems, units 1 and 2 of the Mochovce simulator have been fully renovated by CORYS. Renovation has involved migration to a Windows PC platform, a new instructor station, replacement of the 10,000 inputs/outputs, and new ...
12 Mar, 2014
One of the largest, most complex simulator upgrades in the U.S. nuclear power industry is proceeding on schedule at the NextEra Point Beach nuclear plant in Wisconsin.
10 Jan, 2014
In a world first, EDF will be equipping its 900 MW and 1300 MW sites with fullscale simulators equipped with fully digital control rooms, to be used for operator training. These high-fidelity copies of the control room will significantly reduce the ...

Pages

STEPS is a blog eager to provide answers and to bring up new issues with simulation users.

Its information is based on 30 years of CORYS experience of simulation and on the feedback from our customers around the world, in the field of Transportation, Power and Hydrocarbons industries.

line
www.corys.com blog@corys.frFollow us on Linkedin

Subscribe to Power